DEscription of the extended LIfetime and its influence on the SAfety operation and construction materials performance – Long Term Operation with no compromises in the safety
Short desciption
The main scope of the DELISA-LTO project is the implementation of the non-destructive monitoring and/or testing, validation of this approach on the materials from the real plant operation with well-described operation history and supported by simulation and modeling with straight influence on the design phase of the component. One of the main contributions of the project is to ensure a safe, predictable and reliable long-term operation. The outputs of the project will lead to the increase of operational safety over the lifetime due to the in-time prediction and avoiding the potential failure.
Project beneficiaries from Ukraine
IPP CENTRE LLC
STATE ENTERPRISE STATE SCIENTIFIC AND TECHNICAL CENTER FOR NUCLEAR AND RADIATION SAFETY